Project: I-CAVS   -  
            Listing of Entries
    (Please mouse-over any icon to get a description of that function).



Categories
  
Builder Name:paolo cavosi   -  
Project:   Vans - RV-10
Total Hours:2429.2
Total Flight Time:
Start/Last Date:May 28, 2019 - No Finish Date
Engine:IO-540 Thunderbolt Serial # EL-38135-48E
Propeller:MT Propeller MTV-12-B/193-53 serial 22G1268-K
Panel:Garmin G3X
 
Friendly URL: https://eaabuilderslog.org?s=I-CAVS

Home or Last Project Picture

Feb 23, 2022     43-7 Cabin Cover step 1-8 - (4 hours)       Category: Fuselage
Installed the gusset for the front bulkhead channels and final drilled. MatchDrilled the #30 holes using the bulkhead channel into the cabin cover on both sides.
Final drilled #12 the channel and the cabin cover.
Clamped the cabin cover to the underlying F1015C mid cabin decks and drilled #30 the holes into the cabin cover and F1015C mid cabin decks. Then final drilled #19 (NOT #12). Clecoed all in place.
After that using an extension i countersunk all the holes to the proper size.


 


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.